Butendiek Offshore Substation

Sea and Land Project Engineering were awarded the work for the design of the substructure and piled foundations. Sub-contracted to the fabricator, Iemants Staalconstructies of Belgium, SLPE designed the 4-legged jacket and piles to the demanding requirements of the German BSH standards organisation.

Fabrication of the Jacket and Topsides for the Butendiek Offshore Substation Platform was completed in early 2014 and installed in the German sector of the North Sea in May 2014 using the Rambiz crane vessel.